Joby Completes Second Stage of eVTOL Certification

Joby becomes the first eVTOL company to complete the second of the five stage certification process and moves the company closer to launching a commercial passenger service by 2025 By Joe Macey / 09 Feb 2023
Follow AAMi

California-based Joby Aviation, Inc., has completed the second of five stages required by the Federal Aviation Administration (FAA) to certify its electric vertical take-off and landing (eVTOL) aircraft for commercial passenger use.

In the second stage of the type certification process, a company identifies the ways in which it will demonstrate it has met the regulatory intent of the safety rules (Means of Compliance) that were defined during the first stage of the process (Certification Basis).

Joby believes it is the first eVTOL company to reach this milestone, having also been the first eVTOL company to complete stage one and have its Certification Basis published in the Federal Register. According to Joby, achieving this goal moves the company one step closer to its target of launching commercial passenger service by 2025.

Didier Papadopoulos, Head of Aircraft OEM at Joby, said: “Certification is an integral part of everything that an aerospace company does and with the achievement of this critical milestone, we’re now able to confidently focus our efforts on closing the remaining certification plans and completing the testing required to certify our aircraft.”

He added: “We’re grateful for the FAA’s dedication to the safe introduction of eVTOL technology and their commitment to supporting continued US leadership in this sector.”

Joby is said to have already made substantial progress in the third stage of the certification process (Certification Plans), with four area-specific certification plans (ASCPs) submitted to the FAA as of November and the company’s first equipment-level qualification test plan submitted to the FAA, enabling for-credit qualification testing to proceed. Progress also continues in stage four (Testing and Analysis) and stage five (Show and Verify). Joby provided a summary of the five stages of type certification in its Q2 2022 Shareholder Letter.

It is typical for a small portion of the Means of Compliance to remain open to allow for further collaboration on minor design changes and improvements that may occur later in the certification process. With 94% of the Means of Compliance now accepted by the FAA, Joby considers the second stage essentially complete.

Posted by Joe Macey Joseph Macey is a Content Specialist at Advanced Air Mobility International, focusing on emerging aviation technologies since joining in 2022. He has particular expertise in eVTOLs, vertiports, and propulsion systems. A graduate of Falmouth University in Journalism, Joseph began his career in 2019 as a local reporter. His journalism experience sharpens both his reporting and interview skills, enabling him to deliver well-informed, authoritative insights on the latest trends in the aviation sector. Connect

Latest Articles

Joby Aviation & Metropolis Technologies Partner to Build 25 U.S. Vertiport Sites

New collaboration leverages AI-driven parking infrastructure and aviation logistics to integrate electric air taxis into existing urban transportation hubs

Dec 23, 2025
Archer to Establish UK Engineering Hub & Appoint Veteran Aerospace Leader

The expansion into South West England marks a strategic move to develop dual-use eVTOL technology for the British Army and defense sectors

Dec 22, 2025
Advanced Air Mobility Milestones in 2025

Advanced Air Mobility International looks back at the industry's most significant milestones in 2025, highlighting flying motorcycles, investments, and infrastructure developments

Dec 19, 2025
First Successful Flight Completed for Generation 6 Autonomous eVTOL

Wisk Aero completes the first flight of its Generation 6 autonomous eVTOL aircraft, validating core flight systems and advancing FAA type certification efforts for future passenger operations in the United States

Dec 18, 2025
Archer Secures Master Lease at Hawthorne Airport as Part of LA Air Taxi Strategy

Archer Aviation's strategic acquisition of airfield positions company for upcoming Los Angeles (LA) network launch and 2028 Olympic Games operations

Dec 17, 2025
Partners Plan UK Electric Air Taxi Network for 2029

New partnership between Vertical Aerospace, Skyports Infrastructure and Bristow aims to cut Canary Wharf to Heathrow journey times to 12 minutes using eVTOL aircraft

Dec 16, 2025